Required Input
- Enter your total purchases of HRPO flat rolled steel, both coil and sheet, for an average year.
Required Input
- Enter in inches. For converting gauge to inches click down on the red button.
Required Input
- The hourly wage paid to factory labor.
Wage rate plus benefits, payroll taxes, etc. Computed as 1.5 x wage rate. DOES NOT INCLUDE OVERHEAD COSTS (burden).
Required Input
SCS is often sold at the same price HRPO, so there may be no savings . If your SCS price is less (or more) than HRPO, enter your prices for both in the green boxes below
and click on the override checkbox
.
Savings in paint prep labor over HRPO, plus savings at laser or plasma cutting work centers due to faster SCS cutting speeds.
SCS reduces lost labor and scrapped sheets from handling accidents, skin irritation, jams from stuck sheets, etc., that accompany using HRPO.
SCS saves labor for cleaning of controls, conveyors, tools, machines, etc. to remove the grime & dirt from HRPO.
Required only IF
you wish to use capacity recovery calculations. Enter rough annual sales of products with HRPO steel content.
Required only
for capacity recovery calculations. Enter value less than 100. No recovery is figured if operating at capacity of 75% or less.
SCS boosts output by reducing interruptions from oily blanks sticking together and downtime to clean equipment.
SCS increases output because less prep work is needed and weld rejects decrease relative to HRPO.
SCS increases uptime because there's less blanks sticking at feed, at transfer and sticking against dies and tooling.
SCS can reduce part rejection from tool slip on excess oil, plus line stops to clean tooling and remove punchouts stuck on oil in tools.
SCS increases output with faster cutting speeds, less frequent replacement of lenses & exhaust filters, and fewer part rejects due to springback.
Handling SCS reduces sheet sticking and shutdown of stackers, conveyors, etc. for cleaning.
SCS can use a leaner paint prep - fewer stages and less handling. The pre-paint area can be reconfigured for SCS' 'lean' process to further increase throughput.
SCS reduces paint problems and repaint or touch up needed because HRPO oil fouled the pre-paint solution or rust developed in handling HRPO
If you destack sheets, some capacity is lost to HRPO (sheets sticking and stopping production lines) even if you did not select a bottleneck operation. Using SCS restores that lost capacity.
With SCS you buy less handling gloves, rags, solvent and cleaner.
With SCS there's less frequent replacement of laser lenses and exhaust filters that get fouled with oil.
Welding SCS can reduce consumption of filler wire & respirator cartridges (to protect from weld fumes).
SCS' leaner paint prep reduces purchase of prep solutions, solvents applicators, exhaust filtering and respirators, and cuts storage & disposal costs
SCS INTERACTIVE SAVINGS CALCULATOR
A FILL-IN-THE-BLANK ESTIMATOR FOR FABRICATORS TO
ANALYZE THE SAVINGS FROM SWITCHING FROM HRPO TO SCS
Enter information for your manufacturing operations in the green cells below.
Where actual values are not available, enter estimates or vary inputs to see sensitivities.
Place cursor over red button in front of each colored cell for explanation.
HRPO consumed per year (coil and sheet):
tons
Average thickness of this HRPO material:
inch
Average manufacturing labor wage rate:
$/hour
Average manufacturing total comp. rate:
$/hour
Number of direct employees involved in
fabricating/handling/painting sheet steel:
Check the box for each manufacturing operation listed below that you do "in-house"
Blanking
Shearing
Folding/Bending
Grinding
Destacking
Press Brake
Roll Forming
Painting - Wet
Robotic Welding
Stamping
Laser Cutting
Painting - Powder
Manual Welding
Punching
Plasma/Torch Cut
DIRECT MATERIAL COST DIFFERENCE:
/yr. more to buy HRPO
based on SCS being same price as HRPO
C
heck box to override calculator with your own values, which you must enter below:
Your price for HRPO:
$/ton
Your Price for SCS:
contact your SCS supplier
$/ton
LABOR-RELATED COST SAVINGS:
based on less labor needed to deal with & remove oil
Direct Labor Cost Savings:
/yr.
Scrap/Rework, Lost Time Savings:
/yr.
Maintenance/Housekeeping Savings:
/yr.
TOTAL LABOR-RELATED SAVINGS:
/yr. savings from SCS
CAPACITY-RECAPTURE BENEFIT:
based on increased output from eliminating oil issues
Annual sales of product from this facility with
significant HRPO steel content:
$ (US)
At what percentage of the facility's output
.
capacity do you normally operate?
76
Check the box for any operations below that constrain plant output (a "bottleneck")
Blanking
Stamping
Laser/Plasma
Paint Prep
Welding
Roll Forming
Material Handling
Painting
Increased Sales from increased output at "bottlenecks"
(click yellow cell for explanation)
:
Blanking:
Laser/Plasma:
Welding:
Material Handling:
Stamping:
Paint Prep:
Roll Forming:
Painting:
TOTAL CAPACITY RECAPTURE:
CONSUMABLES SAVINGS:
from reduced cleaning, filtering, maintenance with SCS
Cleaning & Handling Supplies:
/yr.
Laser/Plasma Consumables:
/yr.
Welding Consumables:
/yr.
Cleaning/Paint Prep Supplies:
TOTAL SAVING ON CONSUMABLES:
/yr. by eliminating oil
TOTAL ANNUAL COST SAVINGS FROM
/yr. estimated
REPLACING HRPO WITH SCS:
Copyright © 2008 The Material Works Ltd.
The browser does not support JavaScript. The calculations created using
ExcelEverywhere
will not work. Please access the web page using another browser.